+8613761035942 James@yohomachinery.cn
  • 🇬🇧English
  • 🇫🇷Français
  • 🇪🇸Español
  • 🇩🇪Deutsch
  • 🇮🇹Italiano
  • 🇷🇺Русский
  • 🇸🇦العربية
|

Pharmaceutical & Packaging Machinery for Nigeria

Capsule, tablet, purified water, metal can and tube lines for manufacturers in Lagos, Ogun, Ibadan and Port Harcourt.
Built for 230 V / 50 Hz with wide-voltage tolerance and AVR protection, shipped CIF Apapa or Tin Can with SONCAP support.

CE Certified cGMP Compliant ISO 9001 SONCAP Support

A Supplier Who Understands How Nigerian Plants Actually Run

Nigeria is one of the most active pharmaceutical markets in Africa, with a manufacturing cluster concentrated in Lagos and Ogun State — Ikeja, Ilupeju, Agbara, Sango Ota — plus a smaller base in Ibadan and Port Harcourt. The companies we work with are usually expanding a specific dosage line rather than building a plant from zero, and they are extremely cost-aware on landed price because the naira has made imported capital equipment expensive in local terms.

The engineering consequence is different from Europe or the Gulf. Machines have to tolerate a supply that sags and spikes, run through outages by switching to generator power without tripping a drive, and keep running when the spare part you need is three weeks away by sea. YohoAI has supplied West African plants since 2010 from our Shanghai factory.

This page covers what Nigerian buyers ask us most: which machine fits which product, how we build for unstable 230 V supply, what SONCAP and NAFDAC actually require, and how equipment reaches Apapa or Tin Can without a demurrage bill.

Six Production Lines, One Factory

Every line is built in our Shanghai plant and CE certified at machine level. If your site runs on generator power for part of the day, tell us at quotation stage — several parameters change and it is cheaper to specify them now than to retrofit.

Hard Capsule Filling

NJP series 30,000–228,000 capsules/hour at ±3–5 % accuracy. The NJP-800 and NJP-1200 are the volume fit for most Nigerian capsule plants.

Most requested here: NJP-800

Tablet Compression

ZP series rotary presses from 19 to 45 stations, 50,000–400,000 tablets/hour, with single-punch units for pilot batches.

Most requested here: ZP-19

Purified Water Systems

PW series 250–5,000 L/h with RO and EDI, sized for borehole feed water — which is what most Nigerian sites actually use.

Most requested here: PW-500

Softgel Encapsulation

RG series rotary die machines 5,000–60,000 capsules/hour, with chiller and dryer for a complete turnkey line.

Most requested here: RG-100

Metal Can & Lid Lines

YC series 60–300 cans/minute for food, beverage and paint tins, with easy-open end capability.

Most requested here: YC-60

Plastic Tube Lines

YG series 60–150 tubes/minute for cosmetic and pharma creams, ABL and PBL, with inline capping and leak testing.

Most requested here: YG-120

Power, Voltage and Generator Operation

Nigerian industrial supply is nominally 230 V single phase and 415 V three-phase at 50 Hz, but the number on the nameplate is not what the machine usually sees. Voltage swings of ±15 % are routine, and a plant that switches to generator power mid-shift introduces a further step change in both voltage and frequency stability.

We therefore specify differently for Nigeria: a wide-input AVR or stabiliser on the machine incomer, contactors and drives rated with headroom rather than at the nominal value, a phase-sequence and under-voltage relay that stops the machine cleanly instead of letting a servo fault mid-cycle, and a documented generator-changeover procedure in the manual. On purified water systems we add a low-pressure cut-out so the pump does not run dry during a supply interruption.

ParameterTypical Nigerian supplyWhat we build
Three-phase415 V / 50 Hz nominal, ±15 % swingsWide-input drives, AVR on incomer, under/over-voltage relay
Single phase230 V / 50 HzControls isolated; surge protection on the control transformer
ChangeoverGrid ↔ generator, several times a dayClean-stop logic documented in the manual; no hot switching
Ambient30–34 °C, high humidity on the coast304 SS product contact, IP65 panels, anti-condensation heaters
Feed waterBorehole, high hardness and ironSand + carbon + softener + anti-scalant ahead of the RO skid

SONCAP, NAFDAC and the Import File

Two documents decide whether your machine leaves the port: a SONCAP certificate and a clean import file. SONCAP is Nigeria's conformity assessment programme — the exporter registers the product, obtains a Product Certificate, and each shipment is issued a SONCAP Certificate (SC) that customs requires before release. Ship without it and the container sits at Apapa while storage charges accumulate.

NAFDAC regulates the product, not the machine, in the same way BPOM does in Indonesia. What NAFDAC inspection looks for is the equipment's qualification evidence: DQ/IQ/OQ, material certificates for product-contact parts, cleaning validation support and calibration certificates. We prepare that package as part of the order, not as an afterthought.

DocumentPurposeWho prepares it
SONCAP Product CertificatePre-registration of the product for export to NigeriaYohoAI, before first shipment
SONCAP Certificate (SC)Per-shipment release document required by customsYohoAI, per shipment
Form M / PAARFX allocation and pre-arrival assessmentBuyer's bank
Commercial invoice + packing listCustoms declaration basisYohoAI
CE certificate + declarationMachinery safety conformityYohoAI
DQ / IQ / OQ protocolNAFDAC inspection evidenceYohoAI
Material certificates (SS 304/316L)Product-contact complianceYohoAI

Shipping, Incoterms and Realistic Lead Times

We quote FOB Shanghai or CIF to Apapa, Tin Can Island or Onne. CIF is usually the better choice for a first order because it fixes the freight component of your landed cost before the Form M is raised, and currency movement between order and shipment is the single most common reason a Nigerian project becomes unaffordable halfway through.

Manufacturing runs 6–10 weeks. Ocean transit to Lagos is 30–35 days on the direct service, longer via transhipment. Then add clearance: with SONCAP in hand and a complete file, two to three weeks is realistic; without it, considerably more.

Destination portOcean transit from ShanghaiNotes
Apapa (Lagos)30–35 daysMain gateway; the most congested — book early
Tin Can Island (Lagos)30–35 daysOften faster release than Apapa for containerised cargo
Onne (Port Harcourt)35–40 daysBetter for south-east and Niger Delta plants
Lagos air freight (urgent spares)5–8 daysUsed for critical spares only, cost is high

Installation, Training and Spares Strategy

Installation is supervised remotely by video for single machines and on site for full lines. Because a service visit to Nigeria is a real cost for both sides, we front-load the planning: before the container ships you receive the layout drawing, foundation and utility requirements, and a commissioning checklist so that site preparation is finished by the time the machine lands.

The spares question matters more in Nigeria than almost anywhere else. A worn punch or a failed sensor that would be a two-day fix in Europe can stop production for a month if it has to clear customs as a small parcel. We therefore recommend a first-order spares kit sized for twelve months of running — dies or punches, seals, filter cartridges, one drive, one PLC module — and we will tell you honestly which parts wear and which do not.

Other Markets We Supply

Gulf & Middle East Indonesia Philippines

Questions Nigerian Buyers Ask Us

Will your machines survive unstable voltage and generator power?

Yes, provided we specify for it. Nigerian orders are built with an AVR or stabiliser on the incomer, wide-input drives, under-voltage and phase-sequence protection, and a documented clean-stop procedure for generator changeover. Tell us at quotation stage whether the machine will run on grid, generator or both — retrofitting this protection afterwards costs more than specifying it.

Do I need SONCAP before the machine ships?

Yes. SONCAP is a pre-shipment conformity programme: the product needs a Product Certificate, and each shipment needs a SONCAP Certificate (SC) that customs will ask for before release. Without it the container cannot clear and storage charges start accumulating at the port. We handle the exporter side and issue the documents with the shipment.

Can you supply a complete turnkey capsule plant?

Yes. Because all six lines are built in one factory, a single purchase order can cover capsule filling, tablet compression, purified water, and the packaging line, with one commissioning plan and one documentation package. Most Nigerian customers start with one machine and add lines as volume grows, which is why our machine ranges overlap rather than jump.

What payment terms do you accept?

Standard terms are 30 % T/T deposit with the balance against the bill of lading, or an irrevocable L/C at sight for larger orders. For repeat customers we can discuss staged payments tied to production milestones. We do not ship without a confirmed deposit and a signed PI.

How long until the machine is producing in Lagos?

Six to ten weeks manufacturing, 30–35 days ocean to Apapa or Tin Can, then two to three weeks clearance with a complete SONCAP file, then one to two weeks installation and commissioning. A realistic planning figure is four months from deposit to first batch for a single machine.

What about spare parts after the warranty?

Spares ship from Shanghai by air within 48 hours of a confirmed order, typically 5–8 days door to door. We strongly recommend a twelve-month spares kit with the machine, because a small urgent parcel can spend longer in customs than the repair itself takes.

Request Nigeria Proposal

Send the product, target output and destination port. You receive a model recommendation, a 230 V / 50 Hz configuration built for unstable supply, CIF pricing to Apapa or Tin Can, and a realistic delivery schedule — including what SONCAP needs before shipment.

  • No.999 Husong Rd., Songjiang District, Shanghai, China
  • +8613761035942 (WhatsApp/WeChat)
  • James@yohomachinery.cn
  • Response within 24 hours
🎯
Free Technical Consultation
Get a customized quote in 24 hours
📩 Get Free Quote Now 💬 WhatsApp